DC International Group Inc. Case Study

DC International Group Inc. Case Study

Commercial & Industrial Warehouse Heater Controls Retrofit | Reznor Unit Heater Repair

Customer

DC International Group Inc.

The Challenge

DC International Group Inc. was experiencing problems with a commercial/industrial Reznor warehouse heating system that several HVAC contractors had been unable to repair. The warehouse unit heater had failed, leaving the facility without dependable heat for the winter. Because the controls were obsolete and replacement parts were no longer manufactured, many contractors considered the equipment beyond repair.

After being referred by another contractor, B.I.M.S. was asked to diagnose the system and determine whether the existing equipment could be saved without replacing the entire heating system.

The B.I.M.S. Solution

Our technicians performed a complete diagnostic evaluation of the commercial warehouse heater and determined that the failure was caused by an obsolete PLC controller. The original control system had been discontinued, making a direct replacement impossible.

Rather than recommending an expensive heater replacement, B.I.M.S. worked directly with Reznor engineering to develop a factory-approved controls retrofit solution for the existing warehouse heating equipment.

Once the retrofit kit was designed and the components became available, our technicians completed the controls upgrade, replacing the obsolete PLC with the new retrofit control package and commissioning the system to ensure proper operation.

Services Performed

  • Commercial warehouse heater diagnostics
  • Industrial unit heater troubleshooting
  • Reznor unit heater service and repair
  • PLC controller diagnostics
  • Obsolete control system evaluation
  • Factory engineering coordination with Reznor
  • Controls retrofit design
  • Installation of Reznor retrofit kit
  • Electrical control replacement
  • Operational testing and system commissioning
  • Commercial heating system restoration

The Results

The retrofit successfully restored reliable operation of the warehouse heating system without requiring the customer to replace the entire unit heater. By upgrading the obsolete controls, B.I.M.S. extended the life of the equipment while significantly reducing the customer's capital expense.

The completed retrofit provided dependable warehouse heat before the winter season, improved equipment reliability, and ensured the facility could continue normal operations without costly downtime.

Why B.I.M.S.

Many commercial and industrial HVAC contractors replace equipment when obsolete controls fail. B.I.M.S. specializes in diagnosing difficult HVAC problems, engineering practical retrofit solutions, and working directly with equipment manufacturers to keep existing systems operating safely and reliably.

Whether your facility has obsolete HVAC controls, discontinued PLCs, aging warehouse heaters, industrial unit heaters, rooftop units, process equipment, chillers, or commercial heating systems, our experienced technicians have the knowledge to develop cost-effective repair and retrofit solutions that extend equipment life and reduce operating costs.

Services Provided

  • Commercial HVAC Service
  • Industrial HVAC Service
  • Warehouse Heater Repair
  • Reznor Unit Heater Repair
  • Commercial Heating System Repair
  • Industrial Heating System Service
  • PLC Controls Troubleshooting
  • HVAC Controls Retrofit
  • Obsolete Control System Replacement
  • Factory Retrofit Installation
  • Preventive Maintenance
  • Commercial HVAC Diagnostics
  • Industrial Mechanical Service
  • Building Heating System Repair
  • Warehouse HVAC Maintenance

Need an expert for obsolete commercial HVAC controls or industrial heating equipment? B.I.M.S. specializes in difficult commercial and industrial HVAC repairs, manufacturer-supported retrofit solutions, PLC control upgrades, warehouse heating systems, rooftop units, chillers, refrigeration, and preventive maintenance to keep your facility operating year-round.